Lincoln Main 132kV Substation – Aluminium Structures
Kelvin Power Consultants won the order for the design and supply of aluminium structures to Western Power Distribution, Lincoln Main Substation Project.
The structures were delivered over two phases of site works, and in total some 61 structures delivered to site on time.
All structures for this site have been erected and equipment installation is ongoing.
Kelvin Power Consultants had to design structures to fit the specific constraints of the site, in particular to fit into the existing foundations.